When will the M6 Toll aqueduct be connected to the canal?

We are aiming to connect the footpath over the M6 Toll aqueduct first, before the canal itself is completed, in order to provide a fully connecting extension to the Heritage Towpath Trail. The processes of seeking planning permission and registering our land with Land Registry have brought up some issues. Midland Expressway Limited who operate the motorway will require …

When will the M6 Toll aqueduct be connected to the canal? Read More »

When will you add water to the completed sections?

We can only add water to sections, which can be properly contained. This will usually be between locks where we can add stop planks. We try to add water as soon as we can but it is not always possible for every section. Read our operational plan for more details.

When will the Lichfield Canal be finished?

The answer is that if someone or some organisation gives us an estimated £40m it could be done in another five to ten years! (That assumes all planning applications and land transfers are completed quickly)! But with limited ‘regular’ income, it’s impossible to answer. Read more about funding.

What is the Big Pipe?

The Big Pipe was installed in the 1960s to carry both steady spring water and storm runoff through the old canal route after it was closed to navigation. The original canal used to be fed by a base flow of clean, steady spring water coming from underground near St John’s, around locks 20 to 22. It also helped collect …

What is the Big Pipe? Read More »